What Are We Doing?

Opposing the hostile takeover of Liberty Apple Valley

  • Commentary
  • Documents
    • Public documents
    • AVRWC documents
    • Cramer Family Park
    • EPCOR acquisition news
    • LAV documents
    • Missoula trial documents
    • TOAV documents
    • TOAV e-mails
    • TOAV invoices
    • Video and audio files
  • The rat-hole
  • Reference
    • About us
    • Links
    • Related items
    • The players
    • Water cost comparisons

Documents and reference materials

2009

May

  • 20090508 Decision on Base Year 2009 Cost of Capital for the Three Large Multi-District Class a Water Utilities: California Water Service Company, California American Water, and Golden State Water Company (D0905019)

July

  • 200907 Hacienda at Fairview Valley

August

  • 20090831 City’s finance director placed on leave

September

  • 20090901 AVCC water rights uncertain
  • 20090923 TOAV considers backing out of AVCC purchase
  • ← 2008
  • 2010 →

In addition, there are other factors that show the Town’s Project is not planned in the manner most compatible with the greatest public good and the least private injury. And these factors are, simultaneously, additional evidence disproving that the Town’s Project is required by the public interest and necessity, or that the Town’s Project constitutes a ‘more necessary public use’ of Liberty’s water system.

— Superior Court Judge Donald Alvarez

Executive summary

My proposal

Maintained by Greg Raven.
Back to Top